lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

★★★★★ 5.0 72 reviews

US$8.60
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by support.bwh.org.uk
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$8.60
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Dec 2
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by support.bwh.org.uk
Free 30-day returns Details

Product details

Management number 223127866 Release Date 2026/05/09 List Price US$8.60 Model Number 223127866
Category
  • SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
  • NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
  • LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
  • SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
  • SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 50foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
UPC 698775283515
ASIN B07VDY7ZNS
Size rope3/8"x50'
Color Orange
Pattern 3/8 inch * 50foot
Brand Name Lynxking
Unit Count 1 Count
Closure Type Snap
Manufacturer Keenleader.,ltd.
Model Number LL-1
Material Type Metal, Polypropylene
Dog Breed Size Small
Target Species Dog
Included Components leash
Warranty Description 2 years
Item Dimensions L x W 600"L x 0.38"W
Manufacturer Part Number LL-1

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

5 out of 5
★★★★★
72 ratings | 30 reviews
How item rating is calculated
View all reviews
5 stars
90% (65)
4 stars
0% (0)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (7)
Sort by

There are currently no written reviews for this product.